Cleanroom Components
Cleanroom Components

Door & WindowDoor & Window Cleanroom PanelsCleanroom Panels Aluminum ProfilesAluminum Profiles Cleanroom FloorCleanroom Floor

AC&CTRL
AC&CTRL

ChillerChiller AHUAHU Intelligent Control SystemIntelligent Control System

Air Shower & Pass Box
Air Shower & Pass Box

Air ShowerAir Shower Cargo Air ShowerCargo Air Shower Static Pass BoxStatic Pass Box Air Shower Pass BoxAir Shower Pass Box

Cleanroom Furniture
Cleanroom Furniture

LockerLocker Cleanroom Shoe RacksCleanroom Shoe Racks Gown Rack Gown Rack Storage CabinetStorage Cabinet Gowning BenchGowning Bench WorktableWorktable Lab ChairLab Chair TrolleyTrolley SinkSink Sink TableSink Table

Laminar Flow Cabinet
Laminar Flow Cabinet

Laminar Air Flow - Laminar WardrobeLaminar Air Flow - Laminar Wardrobe Laminar Air Flow - Laminar StorageLaminar Air Flow - Laminar Storage

Ductless Fume Hood
Ductless Fume Hood

Ductless Fume HoodDuctless Fume Hood Filtration Medicine Cabinet HoodFiltration Medicine Cabinet Hood

Laminar Flow Bench
Laminar Flow Bench

Horizontal Laminar Flow BenchHorizontal Laminar Flow Bench Vertical Laminar Flow BenchVertical Laminar Flow Bench

ISO5 Isolator
ISO5 Isolator

Glove boxGlove box ISO5 IsolatorISO5 Isolator

 Sterility Test-FastIns Medical Cleanroom Project

Sterility Test-FastIns Medical Cleanroom

Project: Medical sterility test modular cleanroom
Area:  20.4 ㎡

Inner Height:  2.5 m
Class:ISO 8 (Class 100,000)

Design Temperature:18-25℃
Industry: Bio pharmaceutical

(pharmaceutical clean room/bio clean room)
Location: Shanghai, China

 

 

Characteristic:

1.Cleanroom built as per GMP standards:

The clean room is designed with first change room, second change room and buffer room, minimizing the pollutants from personnel and ensuring experiment accuracy

2.Each room is equipped with UV sterilizing lamps:

Sterility is of high importance for the cleanroom. Each room is equipped with UV sterilization lamps to achieve dust-free and sterile controlled environment. 

3.Modular cleanroom self-contained

The modular clean room is installed in the steel warehouse, which is too high to support suspension. The cleanroom is free-standing, no need extra suspension.  

 

4.Installation completed within two days:

Customer wants to finish installation within two days to initiate their experiments earlier.

Our modular and prefabricated cleanroom components are easy and quick to install, completed within 2 days. 

 

5.Excellent performance, up to standard

All parameters (class, noise level, etc.) have passed the tests, well accepted by customers

 

 

chat