Cleanroom Components
Cleanroom Components

Door & WindowDoor & Window Cleanroom PanelsCleanroom Panels Aluminum ProfilesAluminum Profiles Cleanroom FloorCleanroom Floor

AC&CTRL
AC&CTRL

ChillerChiller AHUAHU Intelligent Control SystemIntelligent Control System

Air Shower & Pass Box
Air Shower & Pass Box

Air ShowerAir Shower Cargo Air ShowerCargo Air Shower Static Pass BoxStatic Pass Box Air Shower Pass BoxAir Shower Pass Box

Cleanroom Furniture
Cleanroom Furniture

LockerLocker Cleanroom Shoe RacksCleanroom Shoe Racks Gown Rack Gown Rack Storage CabinetStorage Cabinet Gowning BenchGowning Bench WorktableWorktable Lab ChairLab Chair TrolleyTrolley SinkSink Sink TableSink Table

Laminar Flow Cabinet
Laminar Flow Cabinet

Laminar Air Flow - Laminar WardrobeLaminar Air Flow - Laminar Wardrobe Laminar Air Flow - Laminar StorageLaminar Air Flow - Laminar Storage

Ductless Fume Hood
Ductless Fume Hood

Ductless Fume HoodDuctless Fume Hood Filtration Medicine Cabinet HoodFiltration Medicine Cabinet Hood

Laminar Flow Bench
Laminar Flow Bench

Horizontal Laminar Flow BenchHorizontal Laminar Flow Bench Vertical Laminar Flow BenchVertical Laminar Flow Bench

ISO5 Isolator
ISO5 Isolator

Glove boxGlove box ISO5 IsolatorISO5 Isolator

 GMP Cleanroom Classification - FastIns Modular Cleanroom Project

 GMP Cleanroom - Saudi Arabia FastIns Modular Cleanroom

Project: GMP Validation cleanroom
Area:  192 ㎡

Class: ISO 8 (Class 100,000)

Design temperature/RH:22-24℃/40-60%

Industry: Medical Appliance
Location: Saudi Arabia

 

 

Characteristic:

1.Multiple small rooms, irregular shape

As per production demands, multiple small rooms and a clean corridor are designed. The customer also requires to go around the columns, we customize cleanroom in irregular floor plan. 

2.Custom HVAC system

In response to local hot weather and to meet the control requirements and guarantee fast and simple installation, we carefully select the air conditioning units and fabricate insulated cloth air ducts, making installation easy for customer and realizing required temperature and humidity.

3.Prefabrication in Airkey factor

Components like frames, wall panels, ceilings are all prefabricated and assembled before shipment. Customer's workers finish installation within one week for this 200m2 cleanroom, saving labor costs and starting operation earlier.

4.Good performance, passing GMP validation

Conduct trial test and send all necessary documents, such as 4Q documentation, test reports, etc. Client pass local GMP validation.

 

5.Excellent performance, up to standard:

All equipment will be prefabricated and labeled before shipment. After installation, our factory will do all tests for the cleanroom, including cleanliness, lux, and air velocity and share the test report with customers.

 

 

chat