Project: Medical Device Manufacturing Cleanroom Area: 128 ㎡ Inner height:2.9m Class: ISO 7(Class 10000); Design temperature/RH: 22-26℃/45-65% Industry: Medical Equipment Location: Australia |
Characteristic:
1.The modular cleanroom is required to be made of 100mm thick sandwich panel and connecting windows:
Due to Australian governmental requirements, the modular cleanroom wall needs to be 100mm-thick sandwich panel.
In order to observe operation inside, customer requests the windows need to be customized as connecting windows, flush with wall panels, bright and clear.
2.Heavy AC units placed on top of modular cleanroom:
The heavy-weight aircon units need to be put on top of cleanroom since there is no extra place at site, a big challenge for cleanroom structure.
3.Load-bearing test of cleanroom structure
As per Australian governmental requirements, customer specially asked an authorized third party to conduct load-bearing test on cleanroom structure, and the test results showed that it was qualified and reached the standard
4.Excellent performance, up to standard:
All parameters (class, temperature, etc.) have passed the tests, well accepted by customers