Cleanroom Components
Cleanroom Components

Door & WindowDoor & Window Cleanroom PanelsCleanroom Panels Aluminum ProfilesAluminum Profiles Cleanroom FloorCleanroom Floor

AC&CTRL
AC&CTRL

ChillerChiller AHUAHU Intelligent Control SystemIntelligent Control System

Air Shower & Pass Box
Air Shower & Pass Box

Air ShowerAir Shower Cargo Air ShowerCargo Air Shower Static Pass BoxStatic Pass Box Air Shower Pass BoxAir Shower Pass Box

Cleanroom Furniture
Cleanroom Furniture

LockerLocker Cleanroom Shoe RacksCleanroom Shoe Racks Gown Rack Gown Rack Storage CabinetStorage Cabinet Gowning BenchGowning Bench WorktableWorktable Lab ChairLab Chair TrolleyTrolley SinkSink Sink TableSink Table

Laminar Flow Cabinet
Laminar Flow Cabinet

Laminar Air Flow - Laminar WardrobeLaminar Air Flow - Laminar Wardrobe Laminar Air Flow - Laminar StorageLaminar Air Flow - Laminar Storage

Ductless Fume Hood
Ductless Fume Hood

Ductless Fume HoodDuctless Fume Hood Filtration Medicine Cabinet HoodFiltration Medicine Cabinet Hood

Laminar Flow Bench
Laminar Flow Bench

Horizontal Laminar Flow BenchHorizontal Laminar Flow Bench Vertical Laminar Flow BenchVertical Laminar Flow Bench

ISO5 Isolator
ISO5 Isolator

Glove boxGlove box ISO5 IsolatorISO5 Isolator

Medical Device Manufacturing 100mm Thick FastIns Modular Clean room
Related Information

 

Project: Medical Device Manufacturing Cleanroom
Area: 128 ㎡
Inner height:2.9m
Class: ISO 7(Class 10000);
Design temperature/RH: 22-26℃/45-65%
Industry: Medical Equipment
Location: Australia

 

 

Characteristic:

1.The modular cleanroom is required to be made of 100mm thick sandwich panel and connecting windows:

Due to Australian governmental requirements, the modular cleanroom wall needs to be 100mm-thick sandwich panel.
In order to observe operation inside, customer requests the windows need to be customized as connecting windows, flush with wall panels, bright and clear. 

2.Heavy AC units placed on top of modular cleanroom:

The heavy-weight aircon units need to be put on top of cleanroom since there is no extra place at site, a big challenge for cleanroom structure.

3.Load-bearing test of cleanroom structure

As per Australian governmental requirements, customer specially asked an authorized third party to conduct load-bearing test on cleanroom structure, and the test results showed that it was qualified and reached the standard

4.Excellent performance, up to standard:

All parameters (class, temperature, etc.) have passed the tests, well accepted by customers

 

 