Cleanroom Components
Cleanroom Components

Door & WindowDoor & Window Cleanroom PanelsCleanroom Panels Aluminum ProfilesAluminum Profiles Cleanroom FloorCleanroom Floor

AC&CTRL
AC&CTRL

ChillerChiller AHUAHU Intelligent Control SystemIntelligent Control System

Air Shower & Pass Box
Air Shower & Pass Box

Air ShowerAir Shower Cargo Air ShowerCargo Air Shower Static Pass BoxStatic Pass Box Air Shower Pass BoxAir Shower Pass Box

Cleanroom Furniture
Cleanroom Furniture

LockerLocker Cleanroom Shoe RacksCleanroom Shoe Racks Gown Rack Gown Rack Storage CabinetStorage Cabinet Gowning BenchGowning Bench WorktableWorktable Lab ChairLab Chair TrolleyTrolley SinkSink Sink TableSink Table

Laminar Flow Cabinet
Laminar Flow Cabinet

Laminar Air Flow - Laminar WardrobeLaminar Air Flow - Laminar Wardrobe Laminar Air Flow - Laminar StorageLaminar Air Flow - Laminar Storage

Ductless Fume Hood
Ductless Fume Hood

Ductless Fume HoodDuctless Fume Hood Filtration Medicine Cabinet HoodFiltration Medicine Cabinet Hood

Laminar Flow Bench
Laminar Flow Bench

Horizontal Laminar Flow BenchHorizontal Laminar Flow Bench Vertical Laminar Flow BenchVertical Laminar Flow Bench

ISO5 Isolator
ISO5 Isolator

Glove boxGlove box ISO5 IsolatorISO5 Isolator

IPC Rework Workshop-Modular Cleanroom in Electronics Industry
Related Information

 

Project:  IPC Rework Workshop Modular Cleanroom

Area14㎡

Inner height:  2.3m

Class: ISO 6(Class 1,000 )

Industry:  IPC (Electronics Modular Cleanroom

Location: Guangming District of Shenzhen (China)

Class 1000 Electronics Cleanroom IPC Rework Worshop

 

Characteristic:

1. Anti-static acrylic panel:

  Anti-static acrylic panels combine high transparency with impact resistance for aesthetics and durability. They neutralize static charges to protect electronics, resist chemical corrosion, and are recyclable.

Modualr cleanroom with emergency door

2.Adjustable foot cup 50-100mm:

  SS304 steel foot cups provide exceptional load-bearing capacity with simple, quick installation. Height adjustment (50-100mm) ensures stable leveling on uneven floors.

3.Intelligent control screen:

  EC-FFUs are centrally controlled with PLC control system for high-volume and high-performance operation. Support single-click control of multiple units, real-time status monitoring, and streamlined maintenance.

 

Cleanroom with intelligent control panel

4.Quick-opening emergency door:

  The emergency door is set in a location that is easy to reach quickly and is equipped with a fire lock to ensure that it can be opened quickly in an emergency. The door is inlaid with a sealing strip to effectively ensure the airtightness and cleanliness of the clean room.

 

Customer Feedback 

  After the project was delivered and put into use, the customer provided positive feedback. The working environment in the repair workshop has been significantly improved. The yield rate of products has increased by 10% to 20% due to the cleanroom. The intelligent control screen is easy to operate, and FFU group control system is precise and stable, greatly enhancing work efficiency. The anti-static acrylic board effectively reduces the loss of electronic components caused by static electricity. Adjustable foot cups flexibly adapt to the uneven floor of the workshop, ensuring the stable operation of the modular cleanroom. The quick-opening emergency exit door also makes the customer feel more at ease in terms of safety.

Cleanroom Testing ESD test and particle count test

 

  Airkey can provide professional on-site installation services. After the cleanroom is installed on-site, it will be strictly tested in accordance with standard procedures for key parameters such as cleanliness, illuminance, air velocity, and anti-static level. The test results of past projects have all passed at one time, and the acceptance and delivery have been successfully completed, winning the trust of customers with reliable quality. The installation and commissioning costs are included in the installation and commissioning cost section of the overall budget to ensure a smooth process from the construction to the delivery of the entire project. At the same time, a detailed subsequent maintenance plan has been formulated for customers, with regular follow-up visits to check the operation status of the equipment and timely solve potential problems to ensure the long-term stable operation of the cleanroom.

 