ISO9001, ISO14644-1, FDA, UL, CE | GMP, cGMP, USP797, USP800
Cleanroom Components
Cleanroom Components

Door & WindowDoor & Window Cleanroom PanelsCleanroom Panels Aluminum ProfilesAluminum Profiles Cleanroom FloorCleanroom Floor

AC&CTRL
AC&CTRL

ChillerChiller AHUAHU Intelligent Control SystemIntelligent Control System

Air Shower & Pass Box
Air Shower & Pass Box

Air ShowerAir Shower Cargo Air ShowerCargo Air Shower Static Pass BoxStatic Pass Box Air Shower Pass BoxAir Shower Pass Box

Cleanroom Furniture
Cleanroom Furniture

LockerLocker Cleanroom Shoe RacksCleanroom Shoe Racks Gown Rack Gown Rack Storage CabinetStorage Cabinet Gowning BenchGowning Bench WorktableWorktable Lab ChairLab Chair TrolleyTrolley SinkSink Sink TableSink Table

Laminar Flow Cabinet
Laminar Flow Cabinet

Laminar Air Flow - Laminar WardrobeLaminar Air Flow - Laminar Wardrobe Laminar Air Flow - Laminar StorageLaminar Air Flow - Laminar Storage

Ductless Fume Hood
Ductless Fume Hood

Ductless Fume HoodDuctless Fume Hood filtration medicine cabinet hoodFiltration Medicine Cabinet Hood

Laminar Flow Bench
Laminar Flow Bench

Horizontal Laminar Flow BenchHorizontal Laminar Flow Bench Vertical Laminar Flow BenchVertical Laminar Flow Bench

ISO5 Isolator
ISO5 Isolator

Glove boxGlove box ISO5 IsolatorISO5 Isolator

Cleanroom cleaning after Construction

One major cause of complications during the handover of a newly constructed cleanroom is not having a clear post-construction cleaning plan. Builders are responsible for delivering the facility cleaned, ready to meet a certain standard, but you as the room owner are responsible for these contaminants being removed prior to certification. Failing to eliminate particles and residue generated during the construction phase could result in these contaminants remaining in the environment for years to come. Just cleaning away visible debris is not sufficient to keep a cleanroom to reach a certain clean class. Particles must be removed to the sub-micron level (Must be measured by particle counter or other professional devices). Builders, along with general cleaners, lack the specialist cleanroom cleaning expertise, methods and equipment necessary to clean surfaces to the required ISO Class level. By using incorrect equipment, they could possibly even damage cleanroom surfaces and make them more likely to harbour bacteria and particulates. What can you do to prevent the risk of a less-than-successful post-Construction clean?

A builder has to work with someone familiar with cleanroom cleaning who can develop a list specifically for post-construction cleaning. In a post-construction clean, the whole clean procedure must be divided into three stages, depending on the ISO Class of the room. The first phase focuses on removing gross contamination left from construction. The second phase addresses fine contaminants and prepares the facility for pre-validation and sterile cleans. The last stage is before trial production. Although it is no replacement for full ISO certification, an air particle report made by a hand-held particle counter is a useful guide as to whether a post-construction clean has achieved the desired ISO Class particle results.