ISO9001, ISO14644-1, FDA, UL, CE | GMP, cGMP, USP797, USP800
Cleanroom Components
Cleanroom Components

Door & WindowDoor & Window Cleanroom PanelsCleanroom Panels Aluminum ProfilesAluminum Profiles Cleanroom FloorCleanroom Floor

AC&CTRL
AC&CTRL

ChillerChiller AHUAHU Intelligent Control SystemIntelligent Control System

Air Shower & Pass Box
Air Shower & Pass Box

Air ShowerAir Shower Cargo Air ShowerCargo Air Shower Static Pass BoxStatic Pass Box Air Shower Pass BoxAir Shower Pass Box

Cleanroom Furniture
Cleanroom Furniture

LockerLocker Cleanroom Shoe RacksCleanroom Shoe Racks Gown Rack Gown Rack Storage CabinetStorage Cabinet Gowning BenchGowning Bench WorktableWorktable Lab ChairLab Chair TrolleyTrolley SinkSink Sink TableSink Table

Laminar Flow Cabinet
Laminar Flow Cabinet

Laminar Air Flow - Laminar WardrobeLaminar Air Flow - Laminar Wardrobe Laminar Air Flow - Laminar StorageLaminar Air Flow - Laminar Storage

Ductless Fume Hood
Ductless Fume Hood

Ductless Fume HoodDuctless Fume Hood filtration medicine cabinet hoodFiltration Medicine Cabinet Hood

Laminar Flow Bench
Laminar Flow Bench

Horizontal Laminar Flow BenchHorizontal Laminar Flow Bench Vertical Laminar Flow BenchVertical Laminar Flow Bench

ISO5 Isolator
ISO5 Isolator

Glove boxGlove box ISO5 IsolatorISO5 Isolator

Sterile Bio Cleanroom - FastIns Modular Cleanroom

 

Project: Biological Cell Cleanroom

Area: 12.88

Internal height: 2.8m 

Class: ISO 6(class 1,000 )  (Class 100,000)

Design Sterility: 

Settling Microbe: ≤3cfu/petri dish;

Airborne Microbe: ≤100cfu/m³; 

Industry: Biological Laboratory

Location: Langfang, Hebei

 

Characteristic:

1. Pressure of 3 cleanrooms need to be  displayed separately
We equip the control panel of cleanroom with 3 pressure gauges to separately display the required pressure of each room. 

2.Simple, beautiful and bright for visitors
Transparent acrylic glass walls are bright with high visuality, eye-catching to visitors.  

3.Simple and fast installation with minimal  environmental impact:
The cleanroom is mounted in 1.5 days, with minimal construction noise, not affecting the normal operation of other departments

4.High standard on cleanroom performance:
The owner hired a third-party to test all parameters after installation. All parameters have passed the tests, successfully delivered and accepted.

 


 

 